From electricity to compute
The technical detail of a star: how connected power becomes compute, what runs in the halls, and why the building is designed for several generations of processors.
Before the GPUs, the power
The scarcest resource in AI is no longer just the processor. It is the ability to have, for the long term, abundant, secured and connected electricity. CASSYOPIA starts from that industrial reality: secure the electrical power first, then build around it an infrastructure optimised for compute.
From the megawatt to the result: four levels not to confuse
- ≈ 40 MWNAVI · request in 20271Connected power
The electricity the grid agrees to deliver to the site. It is the starting point of every star: we request it before promising any date.
- 30 MWNAVI · at most2Compute power (IT)
The share that actually feeds the processors, once cooling and losses are deducted. Our job: keep as much of it as possible.
- H200 · RTX PRONVIDIA3Processors (GPUs)
The processors that power runs. They are sold by servers of 8, then by blocks, and bought only on firm reservation.
- Your results4Useful compute
What counts in the end: trained models, answers served, successful simulations, for every euro and every watt committed.
More useful power. More GPUs. More compute per megawatt.
PUE measures this efficiency: total electricity consumed, divided by the electricity used for compute. The closer it is to 1, the less energy goes to cooling: that is what immersion cooling aims for.
Built for the GPU generations to come
Hardware evolves faster than buildings. So we design each star to host today's processors and prepare the next ones, without rebuilding at every cycle. No previous-generation hardware in the plan, and a full renewal already planned and funded.
NVIDIA H200
The processor for training and intensive compute. Its large on-board memory (141 GB) holds the biggest models. Sold by servers of 8.
NVIDIA RTX PRO 6000 Blackwell
The processor for everyday uses: inference, simulation, image rendering, visualisation and professional environments. Cheaper by the hour.
A dedicated compute network
To train a model, dozens of servers must talk to each other without waiting. An ultra-fast network, reserved for your servers, makes them work together at scale.
Immersion cooling
The servers stand in a dielectric oil, which does not conduct electricity. A heat exchanger passes its heat to a water loop: more processors per square metre, less energy spent stirring air, and recoverable heat.
Memory and storage
Models read and write enormous volumes. Fast disks, spread over many machines, keep pace with the processors: your data never slows training down.
Four steps, one build
The building is built once, at its final size. Processors are installed in steps, in spaces already powered and cooled: your capacity grows without moving.