Up to 30 MW of compute. A building built once, equipped in steps.
The scarce asset is power: we request it from the grid in 2027, and we buy GPUs only on firm reservation. Investors enter through a dedicated fund, are paid before the shareholders and never vote.
- ◆An identified site: 5 hectares in Provence-Alpes-Côte d'Azur, and a grid connection request of about 40 MW to be filed in 2027 (HTA then HTB), with no offer obtained to date
- ◆A raise of about EUR 152 M in the prudent case; GPUs are bought only on firm reservation, step by step
- ◆Capital is remunerated, never admitted: 6 % secured notes and non-voting preference shares, through a dedicated fund; no ordinary share issued
- ◆The V9 business plan in three scenarios, year by year: revenue, EBITDA (EUR 201.5 M in 2035 in the central case), the waterfall and the investors' potential returns
- ◆An identified, stable governance: 48 INVEST, president, approves every investor
Financial terms, scenarios, yearly returns and the data room are reserved for the investor space, after approval and acceptance of the non-disclosure agreement. Nothing on this site constitutes a public offer.
Data room
V5 dossier of 13 October 2026: investor and commercial presentations, calculation note, CAPEX challenge note, Star 1 business plan (monthly engine, three scenarios), investor product and waterfall note, articles of association V11. Every consultation is logged.
Already have access? Log in →
Request access
Every access is approved individually by the president. National preference applies; foreign investment screening may apply.
This site is not an offer, a solicitation or a recommendation to subscribe to any financial instrument. Any subscription could only take place on the basis of definitive legal documentation.