Readable prices: per GPU-hour, energy at cost
Everything we sell comes down to a number of reserved GPUs, for a term. Here are the orders of magnitude, the same ones the sizing assistant uses. They are indicative; the firm price is written into the contract.
The GPU-hour
The billing unit. A price per GPU and per hour, firm for the whole term of a reservation, with no hidden surcharge on the compute fabric or supervision.
Energy, at cost
The electricity consumed by your block is billed at cost, documented, with the site's measured PUE. It is never buried in a margin.
Storage
High-performance parallel storage billed per TB per month, sized with you (about 110 TB per MW IT in a mixed fleet).
Indicative prices per GPU-hour
| Line | Memory | Reservation (1 to 5 years) | Hourly | Use |
|---|---|---|---|---|
| NVIDIA H200 | 141 Go HBM3e | €2.05 | €2.77 | Training and inference of large models |
| NVIDIA RTX PRO 6000 Blackwell | 96 Go GDDR7 | €0.92 | €1.24 | Inference, rendering, simulation, scientific computing |
The hourly price includes a flexibility premium of about 35 %: no commitment, immediate start on open capacity.
Monthly order of magnitude per block, in reservation
From 8 to 256 GPUs: a low entry price, by the hour or reserved, and the same infrastructure as the large programmes.
Node
8 GPU- H200
- €11,972/ month
- RTX PRO 6000
- €5,373/ month
Trial, proof of concept, one-off peak
Workbench
32 GPU- H200
- €47,888/ month
- RTX PRO 6000
- €21,491/ month
Research team, model development
Cluster
256 GPU- H200
- €383,104/ month
- RTX PRO 6000
- €171,930/ month
Serious training, continuous fine-tuning
From 1,024 GPUs to a whole hall: named capacity, dedicated compute network, separated perimeter, supervision and on-call included. The price stays an hourly rate, not a custom project.
Row
1,024 GPU- H200
- €1,532,416/ month
- RTX PRO 6000
- €687,718/ month
Pre-training a 70-billion-class model
Dedicated hall
1,536 GPU- H200
- €2,298,624/ month
- RTX PRO 6000
- €1,031,578/ month
National programme, model operator
Trusted enclave
Trusted enclave, 400 to 1,800 GPUs with accreditations: case by case, at the same hourly rate.
Excluding energy (billed at cost) and storage. Calculation: GPUs × 730 hours × GPU-hour price. The trusted enclave is priced on file.
Four purchase modes
| Mode | Commitment | Billing | Price |
|---|---|---|---|
| Reservation | 1 to 5 years | Named capacity, firm price | Firm GPU-hour price, above |
| Package | 1 year | Monthly envelope | Monthly envelope on quote, based on the reservation price |
| Hourly | none | Per GPU-hour consumed | ≈ 1.35 × the reservation price, per GPU-hour consumed |
| Trusted enclave | on file | Custom, after approval | Tailor-made, after approval |
- Sizing before the contract, validated by an engineer
- Dedicated compute fabric between the nodes of a block
- Orchestration: software stack, scheduler, priority queues, quotas
- Operations: supervision, incident recovery, support with on-call duty
- On-site security supervision centre
- Quarterly efficiency review (cost per useful unit of compute)
- Reversibility and verifiable erasure at the end of the contract
- Trusted enclave and specific accreditations
- Physically separated perimeter (dedicated hall) with its own network feed
- Enhanced support: dedicated team, training of your teams on the CyberRange
- Storage beyond the standard sizing
- Research programmes with the laboratory
Parallel storage: €25 per TB per month (indicative). Energy billed at cost, metered, with documented PUE.
Questions about prices
Are prices guaranteed?
In reservation, the GPU-hour price is firm for the whole term of the contract. The values on this page are orders of magnitude from the business plan; the firm price is written into the contract after sizing.
Why is energy separate?
Because it depends on your actual workload and on the price of electricity. Billing it at cost, with the documented PUE, is more honest than a margin hidden in an all-inclusive price.
Can I change block during the contract?
Yes. Blocks combine and grow without migration: a client who starts on a workshop moves to a cluster then a row without changing environment.
When do reservations open?
Priority reservation requests are open right now. GPUs are bought only on firm reservation: registered partners are contacted first, with a priority rank on the first steps.
A firm price starts with an accurate sizing
The assistant turns your workload into a block and an order of magnitude; an engineer then validates, and the price is written into the contract.
The words of compute, explained simply →
Indicative prices excluding taxes, from the business plan assumptions (October 2026). They are not a contractual offer. Energy billed at cost. The availability date will be set once the grid connection is obtained.