NAVIProvence-Alpes-Côte d'Azur
We do not look for capacity. We produce it, and we operate it with you. NAVI is the first star of the CASSYOPIA constellation, in Provence-Alpes-Côte d'Azur: 5 hectares on an industrial territory connected to the big energy infrastructures. One single two-level building, built once, for a maximum capacity of 30 MW of compute power, cooled by immersion. NVIDIA H200 and RTX PRO 6000 Blackwell GPUs are bought only on firm reservation, and the site is equipped in steps: 4, then 10, 20 and 30 MW IT. The grid connection request, of about 40 MW, will be filed in 2027; no commissioning date is announced before the grid has answered.
A building built once, four compute steps
The building is built once, at its final size. It is then equipped in steps of 4, 10, 20 then 30 MW IT, as firm reservations come in, with no new construction.
First equipment of the building, on firm reservations
Up to 10 MW IT, no further construction
Up to 20 MW IT, in the same building
Maximum capacity of the site
Two product lines, two uses, two price models
No previous-generation hardware anywhere in the plan. GPUs are bought only on firm reservation, step by step.
NVIDIA H200
Training and inference of large models. Sold as multi-year reservation, named capacity, availability commitment.
- Memory / GPU
- 141 GB
- Node
- 8 GPU · 1,128 GB
- Node power
- 10.4 kW
NVIDIA RTX PRO 6000 Blackwell
Inference, rendering, simulation, scientific computing, trusted enclave. Sold as packages and hourly.
- Memory / GPU
- 96 GB
- Node
- 8 GPU · 768 GB
- Node power
- 7 kW
The base unit: the GPU, the node, then the block
| Unit | GPU memory | Power | What it is |
|---|---|---|---|
| 1 H200 GPU | 141 GB HBM3e | 0.7 kW | The hourly billing unit |
| 1 H200 node | 1,128 GB | 10.4 kW | 8 interconnected GPUs, the smallest useful brick |
| 1 RTX PRO 6000 Blackwell GPU | 96 GB GDDR7 | 0.6 kW | The inference and simulation unit |
| 1 RTX PRO 6000 node | 768 GB | 7.0 kW | 8 GPUs, the service brick |
| 1 MW IT | about 110 TB | 1 MW | 919 GPUs in a mixed fleet |
| The full site | about 110 TB per MW IT | 30 MW IT at most | Installed in steps of 4, 10, 20 then 30 MW IT, on firm reservations |
Carried by the teams, not subcontracted to a service level
- 01An on-site security operations centre (SOC): a team that watches the site and the systems around the clock, integrated into operations, never billed as an option.
- 02Separated perimeters, physically and in the network: open capacity, reserved capacity, trusted enclave. Your neighbours never see your machines.
- 03Physical security planned from the design stage: access control, video protection, management of outside contractors.
- 04An on-site CyberRange: a training ground where attacks are simulated to test our procedures, then to train your teams.
- 05A reversibility and verifiable data-erasure plan for the end of the contract, written before signature.
- 06A team that comes from the cybersecurity trade, not from real estate.
What our control guarantees, and the certifications under way
- · Hosting on national territory, on an identified site
- · French chain of responsibility, from the land asset to the operating team
- · French controlling shareholding, every investor approved by the president
- · No extraterritorial law applicable to the site operator
- · End-to-end control of operations: the site complies with its clients' requirements
- ISO/IEC 27001 · Information security management system
- ISO/IEC 27017 · 27018 · Cloud security controls and personal data protection
- ISO/IEC 27701 · Privacy information management (GDPR)
- SecNumCloud (ANSSI) · French cloud security qualification, immunity from extraterritorial laws
- HDS · French health data hosting certification
- ISO 22301 · Business continuity
- ISO 50001 · ISO 14001 · Energy and environmental management
- EN 50600 · Uptime Tier III · Datacenter design and operations, resilience
- SOC 2 Type II · Assurance for international clients
- EUCS · European cloud services certification scheme
- IGI 1300 · II 901 accreditations · Trusted enclave, case by case with the client and the authorities
Sovereignty is not a marketing label. It is a chain of control: we control the site, its operations and the chain of responsibility. Certifications are engaged from the design stage and obtained before commissioning: the compute centre will comply with its clients' requirements.
What is done, what comes next, and when to reserve
| When | Step | For a client |
|---|---|---|
| Done | Choice of the site, in Provence-Alpes-Côte d'Azur | — |
| 2027 | Grid connection request, about 40 MW, HTA then HTB | Power is requested before any date is promised |
| Next | Building permit filed | — |
| Next | Construction of the single building: two levels, 9,500 m² of floor area, built once | — |
| Next | Equipment in steps: 4, then 10, 20 and 30 MW IT | Each step is installed on firm reservations |
Logged into your client or investor space, you follow the programme's detailed progress, its year-by-year roadmap and the calendar of the steps.
Log in to my spaceThree things a client must know before committing
No grid connection offer has been obtained yet
The connection request, of about 40 MW, will be filed in 2027, first in HTA then in HTB. Until the grid operator has answered, we announce no commissioning date. We say it before signature, not after.
Capacity is installed only on firm reservation
NVIDIA H200 and RTX PRO 6000 Blackwell GPUs are bought only when a firm reservation commits them. We do not build up a stock of processors hoping to sell it later.
The building is built once, then equipped in steps
One single two-level building, 9,500 m² of floor area, built at its final size. It is then equipped in steps of 4, 10, 20 then 30 MW IT, as reservations come in, with no new construction.
Where energy, networks and industry converge
The first star, NAVI, is located in Provence-Alpes-Côte d'Azur, on an industrial territory connected to the big energy infrastructures and to the submarine cables of the Mediterranean, one of Europe's main digital crossroads. The next stars will follow the same logic.
Power requested before any promise
The grid connection request for NAVI, about 40 MW, will be filed in 2027, HTA then HTB. No offer has been obtained yet: we announce no date before the grid has answered.
Connected to the Mediterranean cables
The great submarine cables linking Europe to Africa, the Middle East and Asia come ashore in the region, one of the crossroads of the internet.
Low-carbon French electricity
Mostly nuclear and hydro, French electricity emits very little CO₂. Every hour of compute with us weighs little on the climate.
Land sized for the project
Five hectares for one single two-level building, built once at its final size.
Recoverable heat
Processors produce heat. With immersion cooling, it is captured in a water loop instead of being released into the air; its local reuse is under study.
A leading industrial ecosystem
Industry, energy, defence and research in the territory: clients, partners and skilled jobs, trained locally.
A data center that gives something back to the territory
The building is built once, at its final size; capacity is then installed in steps, with no new construction. Heat-reuse figures will be published once the studies have established them.
Reserve on NAVI
GPUs are bought only on firm reservation: reservations trigger each step. Registered partners are contacted first.