γ Cassiopeiae · NaviIn development

NAVIProvence-Alpes-Côte d'Azur

We do not look for capacity. We produce it, and we operate it with you. NAVI is the first star of the CASSYOPIA constellation, in Provence-Alpes-Côte d'Azur: 5 hectares on an industrial territory connected to the big energy infrastructures. One single two-level building, built once, for a maximum capacity of 30 MW of compute power, cooled by immersion. NVIDIA H200 and RTX PRO 6000 Blackwell GPUs are bought only on firm reservation, and the site is equipped in steps: 4, then 10, 20 and 30 MW IT. The grid connection request, of about 40 MW, will be filed in 2027; no commissioning date is announced before the grid has answered.

NAVI · Compute hall · supervision
≈ 40 MWsource substation · HTA then HTBNAVIConnection request in 2027 · no offer obtained to date
Grid connection: substation → site
30 MW IT
Maximum capacity
compute power of the fully equipped site
≈ 40 MW
Grid connection
request to be filed in 2027, HTA then HTB; no offer obtained to date
4 · 10 · 20 · 30
Steps
MW IT, installed as firm reservations come in
NVIDIA
GPUs
H200 and RTX PRO 6000 Blackwell, bought only on firm reservation
9,500 m²
Building
one single two-level building, built once
Immersion
Cooling
dielectric oil loop, heat exchanger, then water loop
1,800 m²
Laboratory
on the upper floor, with the offices
5 ha
Land
in Provence-Alpes-Côte d'Azur
The steps

A building built once, four compute steps

The building is built once, at its final size. It is then equipped in steps of 4, 10, 20 then 30 MW IT, as firm reservations come in, with no new construction.

Step 1
4 MW IT

First equipment of the building, on firm reservations

Step 2
10 MW IT

Up to 10 MW IT, no further construction

Step 3
20 MW IT

Up to 20 MW IT, in the same building

Step 4
30 MW IT

Maximum capacity of the site

The fleet

Two product lines, two uses, two price models

No previous-generation hardware anywhere in the plan. GPUs are bought only on firm reservation, step by step.

NVIDIA H200

Training and inference of large models. Sold as multi-year reservation, named capacity, availability commitment.

Memory / GPU
141 GB
Node
8 GPU · 1,128 GB
Node power
10.4 kW

NVIDIA RTX PRO 6000 Blackwell

Inference, rendering, simulation, scientific computing, trusted enclave. Sold as packages and hourly.

Memory / GPU
96 GB
Node
8 GPU · 768 GB
Node power
7 kW

The base unit: the GPU, the node, then the block

UnitGPU memoryPowerWhat it is
1 H200 GPU141 GB HBM3e0.7 kWThe hourly billing unit
1 H200 node1,128 GB10.4 kW8 interconnected GPUs, the smallest useful brick
1 RTX PRO 6000 Blackwell GPU96 GB GDDR70.6 kWThe inference and simulation unit
1 RTX PRO 6000 node768 GB7.0 kW8 GPUs, the service brick
1 MW ITabout 110 TB1 MW919 GPUs in a mixed fleet
The full siteabout 110 TB per MW IT30 MW IT at mostInstalled in steps of 4, 10, 20 then 30 MW IT, on firm reservations
Security

Carried by the teams, not subcontracted to a service level

  1. 01An on-site security operations centre (SOC): a team that watches the site and the systems around the clock, integrated into operations, never billed as an option.
  2. 02Separated perimeters, physically and in the network: open capacity, reserved capacity, trusted enclave. Your neighbours never see your machines.
  3. 03Physical security planned from the design stage: access control, video protection, management of outside contractors.
  4. 04An on-site CyberRange: a training ground where attacks are simulated to test our procedures, then to train your teams.
  5. 05A reversibility and verifiable data-erasure plan for the end of the contract, written before signature.
  6. 06A team that comes from the cybersecurity trade, not from real estate.
Sovereignty

What our control guarantees, and the certifications under way

Written into the contract
  • · Hosting on national territory, on an identified site
  • · French chain of responsibility, from the land asset to the operating team
  • · French controlling shareholding, every investor approved by the president
  • · No extraterritorial law applicable to the site operator
  • · End-to-end control of operations: the site complies with its clients' requirements
Certifications · under way, obtained before commissioning
  • ISO/IEC 27001 · Information security management system
  • ISO/IEC 27017 · 27018 · Cloud security controls and personal data protection
  • ISO/IEC 27701 · Privacy information management (GDPR)
  • SecNumCloud (ANSSI) · French cloud security qualification, immunity from extraterritorial laws
  • HDS · French health data hosting certification
  • ISO 22301 · Business continuity
  • ISO 50001 · ISO 14001 · Energy and environmental management
  • EN 50600 · Uptime Tier III · Datacenter design and operations, resilience
  • SOC 2 Type II · Assurance for international clients
  • EUCS · European cloud services certification scheme
  • IGI 1300 · II 901 accreditations · Trusted enclave, case by case with the client and the authorities

Sovereignty is not a marketing label. It is a chain of control: we control the site, its operations and the chain of responsibility. Certifications are engaged from the design stage and obtained before commissioning: the compute centre will comply with its clients' requirements.

Timeline

What is done, what comes next, and when to reserve

WhenStepFor a client
DoneChoice of the site, in Provence-Alpes-Côte d'Azur—
2027Grid connection request, about 40 MW, HTA then HTBPower is requested before any date is promised
NextBuilding permit filed—
NextConstruction of the single building: two levels, 9,500 m² of floor area, built once—
NextEquipment in steps: 4, then 10, 20 and 30 MW ITEach step is installed on firm reservations

Logged into your client or investor space, you follow the programme's detailed progress, its year-by-year roadmap and the calendar of the steps.

Log in to my space
Transparency

Three things a client must know before committing

No grid connection offer has been obtained yet

The connection request, of about 40 MW, will be filed in 2027, first in HTA then in HTB. Until the grid operator has answered, we announce no commissioning date. We say it before signature, not after.

Capacity is installed only on firm reservation

NVIDIA H200 and RTX PRO 6000 Blackwell GPUs are bought only when a firm reservation commits them. We do not build up a stock of processors hoping to sell it later.

The building is built once, then equipped in steps

One single two-level building, 9,500 m² of floor area, built at its final size. It is then equipped in steps of 4, 10, 20 then 30 MW IT, as reservations come in, with no new construction.

Where we build

Where energy, networks and industry converge

The first star, NAVI, is located in Provence-Alpes-Côte d'Azur, on an industrial territory connected to the big energy infrastructures and to the submarine cables of the Mediterranean, one of Europe's main digital crossroads. The next stars will follow the same logic.

Power gridMediterraneancables andnetworksIndustrialterritoryTeams andlaboratoryNAVIProvence-Alpes-Côte d'Azur
Schematic diagram
01

Power requested before any promise

The grid connection request for NAVI, about 40 MW, will be filed in 2027, HTA then HTB. No offer has been obtained yet: we announce no date before the grid has answered.

02

Connected to the Mediterranean cables

The great submarine cables linking Europe to Africa, the Middle East and Asia come ashore in the region, one of the crossroads of the internet.

03

Low-carbon French electricity

Mostly nuclear and hydro, French electricity emits very little CO₂. Every hour of compute with us weighs little on the climate.

04

Land sized for the project

Five hectares for one single two-level building, built once at its final size.

05

Recoverable heat

Processors produce heat. With immersion cooling, it is captured in a water loop instead of being released into the air; its local reuse is under study.

06

A leading industrial ecosystem

Industry, energy, defence and research in the territory: clients, partners and skilled jobs, trained locally.

Footprint

A data center that gives something back to the territory

9,500 m²
One single building
two levels, built once at its final size
Immersion
Recoverable heat
the cooling water loop captures the processors' heat; its reuse is under study
1,800 m²
Research laboratory
on the upper floor, with the offices
5 ha
Land
in Provence-Alpes-Côte d'Azur

The building is built once, at its final size; capacity is then installed in steps, with no new construction. Heat-reuse figures will be published once the studies have established them.

Reserve on NAVI

GPUs are bought only on firm reservation: reservations trigger each step. Registered partners are contacted first.